Last week we were up in Hui Kau Laam to rebuild the toilet at our center. After two years the wood and bamboo structure was falling apart. The toilet is also used by other families to wash cloths and to shower. So it became much to small for our purposes.
In the three days we were there we put the cement pilars in, finished the wooden roof construction, the roof tiles and poured the cement slap for the shower. We had to transport all the material from Fang and it took quite some time.
We still have to put the door frames and doors in, as well as make the brick wall. So there is still a lot to do.
Here are some pictures. We have Matt from Switzerland here with us to help with our work. Enoch and Tshati (Mida's husband) were also working with us.