Hui Ba Rai has been without a sufficient water supply for a while. The water that reached to the village was of low quality and not fit for drinking.
We were able to solve this problem through a new water system. After we found a new source of water in the mountain we measured and planed a new project. The result is a two kilometer long PE-pipe winding through the mountains, bigger water storage tanks and a new water distribution system in the village.
Here are some pictures:








Comments